![background image](http://html1.mh-extra.com/html/juniper/ptx10001-36mr/ptx10001-36mr_hardware-manual_2032720057.webp)
Table 21: Site Preparation Checklist
(Continued)
Item or Task
For More Information
Performed by
Date
Cables
Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance allowed
for each cable. Choose the length of
cable based on the distance between the
hardware components being connected.
•
"Determine Transceiver Support for
the PTX10001-36MR" on page 58
•
"Cable and Connector Specifications
for MX and PTX Series Devices" on
page 59
Plan the cable routing and management.
RELATED DOCUMENTATION
PTX10001-36MR Installation Safety Guidelines | 77
Installation Instructions Warning | 153
Chassis and Component Lifting Guidelines | 154
Restricted Access Warning | 154
Rack-Mounting and Cabinet-Mounting Warnings | 156
Grounded Equipment Warning | 160
PTX10001-36MR Site Guidelines and Requirements
IN THIS SECTION
PTX10001-36MR Environmental Requirements and Specifications | 49
48