Table 30: Site Preparation Checklist (continued)
Date
Performed By
For More Information ...
Item or Task
Measure distance between
external power sources and
services gateway
installation site.
Calculate the optical power
budget and optical power
margin.
SRX5600 Site Guidelines and Requirements
IN THIS SECTION
SRX5600 Services Gateway Environmental Specifications | 160
Site Electrical Wiring Guidelines | 162
Clearance Requirements for SRX5600 Services Gateway Airflow and Hardware Maintenance | 163
SRX5600 Services Gateway Environmental Specifications
specifies the environmental specifications required for normal services gateway
operation. In addition, the site should be as dust-free as possible.
160
Summary of Contents for SRX5600
Page 1: ...SRX5600 Services Gateway Hardware Guide Published 2020 02 14 ...
Page 23: ......
Page 105: ...LEDs 106 ...
Page 114: ...Figure 51 SRX5K MPC g030309 MPC empty 115 ...
Page 124: ...Port and Interface Numbering 125 ...
Page 130: ...Port and Interface Numbering 131 ...
Page 156: ......
Page 185: ......
Page 193: ...Figure 84 Installing the Front Mounting Hardware for a Four Post Rack or Cabinet 196 ...
Page 239: ......
Page 285: ...c Upload the configuration to RE2 from the USB device 288 ...
Page 372: ...5 CHAPTER Troubleshooting Hardware Troubleshooting the SRX5600 377 ...
Page 373: ......
Page 407: ......
Page 420: ...423 ...
Page 423: ...Restricted Access Area Warning 426 ...
Page 430: ...433 ...
Page 443: ...Jewelry Removal Warning 446 ...
Page 446: ...Operating Temperature Warning 449 ...
Page 456: ...DC Power Disconnection Warning 459 ...
Page 460: ...DC Power Wiring Sequence Warning 463 ...
Page 463: ...DC Power Wiring Terminations Warning 466 ...
Page 466: ...DC Power Disconnection Warning 469 ...
Page 470: ...DC Power Wiring Sequence Warning 473 ...