Figure 1: Front View of a Fully Configured Services Gateway Chassis
STATUS
SPU0
SERVICE
STATUS
SPU1
SERVICE
HA
OK/F
AIL
CHASSIS
CLUSTER
CONTROL 0
ENABLE
LINK/ACT
CHASSIS
CLUSTER
CONTROL 1
ENABLE
LINK/ACT
STATUS
SPU0
SERVICE
STATUS
SPU1
SERVICE
HA
OK/F
AIL
CHASSIS
CLUSTER
CONTROL 0
ENABLE
LINK/ACT
CHASSIS
CLUSTER
CONTROL 1
ENABLE
LINK/ACT
SPCs
g030218
IOCs
Figure 2: Rear View of a Fully Configured AC-Powered Services Gateway Chassis
30
Summary of Contents for SRX5600
Page 1: ...SRX5600 Services Gateway Hardware Guide Published 2020 02 14 ...
Page 23: ......
Page 105: ...LEDs 106 ...
Page 114: ...Figure 51 SRX5K MPC g030309 MPC empty 115 ...
Page 124: ...Port and Interface Numbering 125 ...
Page 130: ...Port and Interface Numbering 131 ...
Page 156: ......
Page 185: ......
Page 193: ...Figure 84 Installing the Front Mounting Hardware for a Four Post Rack or Cabinet 196 ...
Page 239: ......
Page 285: ...c Upload the configuration to RE2 from the USB device 288 ...
Page 372: ...5 CHAPTER Troubleshooting Hardware Troubleshooting the SRX5600 377 ...
Page 373: ......
Page 407: ......
Page 420: ...423 ...
Page 423: ...Restricted Access Area Warning 426 ...
Page 430: ...433 ...
Page 443: ...Jewelry Removal Warning 446 ...
Page 446: ...Operating Temperature Warning 449 ...
Page 456: ...DC Power Disconnection Warning 459 ...
Page 460: ...DC Power Wiring Sequence Warning 463 ...
Page 463: ...DC Power Wiring Terminations Warning 466 ...
Page 466: ...DC Power Disconnection Warning 469 ...
Page 470: ...DC Power Wiring Sequence Warning 473 ...