•
Rubber safety cap for fiber-optic interfaces or cable
•
Wire cutters
Packing the SRX5600 Services Gateway for Shipment
To pack the services gateway for shipment:
1. Retrieve the shipping crate and packing materials in which the services gateway was originally shipped.
If you do not have these materials, contact your Juniper Networks representative about approved
packaging materials.
2. On the console or other management device connected to the master Routing Engine, enter CLI
operational mode and issue the following command to shut down the services gateway software.
user@host>
request system halt
Wait until a message appears on the console confirming that the operating system has halted.
For more information about the command, see Junos OS System Basics and Services Command Reference
at
www.juniper.net/documentation/
3. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
4. Shut down power to the services gateway by pressing the AC input switch or DC circuit breaker for
all power supplies to the off (O) position.
5. Disconnect power from the services gateway.
6. Remove the cables that connect to all external devices.
7. Remove all field replaceable units (FRUs) from the services gateway.
8. Remove the services gateway chassis from the rack:
•
If you are using a mechanical lift, place the lift platform under the chassis, unscrew and remove the
mounting screws from the rack, and move the chassis to the shipping crate.
•
If you are not using a mechanical lift and the chassis weight is fully supported by a shelf or another
device, unscrew and remove the mounting screws from the rack. Three people can then lift the chassis
and move it to the shipping crate.
417
Summary of Contents for SRX5600
Page 1: ...SRX5600 Services Gateway Hardware Guide Published 2020 02 14 ...
Page 23: ......
Page 105: ...LEDs 106 ...
Page 114: ...Figure 51 SRX5K MPC g030309 MPC empty 115 ...
Page 124: ...Port and Interface Numbering 125 ...
Page 130: ...Port and Interface Numbering 131 ...
Page 156: ......
Page 185: ......
Page 193: ...Figure 84 Installing the Front Mounting Hardware for a Four Post Rack or Cabinet 196 ...
Page 239: ......
Page 285: ...c Upload the configuration to RE2 from the USB device 288 ...
Page 372: ...5 CHAPTER Troubleshooting Hardware Troubleshooting the SRX5600 377 ...
Page 373: ......
Page 407: ......
Page 420: ...423 ...
Page 423: ...Restricted Access Area Warning 426 ...
Page 430: ...433 ...
Page 443: ...Jewelry Removal Warning 446 ...
Page 446: ...Operating Temperature Warning 449 ...
Page 456: ...DC Power Disconnection Warning 459 ...
Page 460: ...DC Power Wiring Sequence Warning 463 ...
Page 463: ...DC Power Wiring Terminations Warning 466 ...
Page 466: ...DC Power Disconnection Warning 469 ...
Page 470: ...DC Power Wiring Sequence Warning 473 ...