Site Preparation Checklist for SSR1200
summarizes the tasks you need to perform when preparing a site
for SSR1200 installation.
Table 7: Site Preparation Checklist for SSR1200 Installation
Item or Task
Additional Information
Environment
Verify that environmental
factors such as temperature
and humidity do not exceed
device tolerances.
"Environmental Requirements and Specifications for SSR1200" on page 19
Power
Measure the distance
between the external power
sources and the device
installation site.
Locate sites for connection of
system grounding.
Calculate the power
consumption and
requirements.
Rack Requirements
Verify that your rack meets
the minimum requirements.
"Rack Requirements for SSR1200" on page 20
Rack Installation
15