DISASSEMBLY INSTRUCTIONS
1-3
2-6: LOADING MOTOR/WORM (Refer to Fig. 2-6-A)
1.
2.
3.
Remove the screw
1
.
Remove the Loading Motor.
Remove the Worm.
Fig. 2-6-A
Loading Motor
Worm
• Screw Torque: 3
±
0.5kgf•cm
Main Chassis
1
NOTE
1.
2.
In case of the Worm installation, check if the value of the
Fig. 2-6-B is correct.
In case of the Loading Motor installation, hook the wire
on the Cassette Opener as shown Fig. 2-6-C.
Fig. 2-6-B
19.2
±
0.1mm
Safety surface for pressing
of the insert.
2-7: TENSION ASS’Y (Refer to Fig. 2-7-B)
1.
2.
3.
4.
5.
6.
Turn the Pinch Roller Cam clockwise so that the Tension
Holder hook is set to the position of Fig. 2-7-A to move
the Tension Arm Ass’y.
Remove the Tension Spring.
Unlock the 2 supports
1
and remove the Tension Band.
Unlock the support
2
and remove the Tension Arm Ass’y.
Unlock the support
3
and remove the Tension Connect.
Float the hook
4
and turn it clockwise then remove the
Tension Holder.
Fig. 2-6-C
Loading Motor
Cassette Opener
Fig. 2-7-B
Tension Band
Tension Connect
Tension Spring
Tension Arm Ass’y
Tension Holder
1
1
3
2
4
NOTE
1.
2.
3.
In case of the Tension Band installation, note the direc-
tion of the installation. (Refer to Fig. 2-7-C)
In case of the Tension Band installation, install correctly
as Fig. 2-7-D.
In case of the Tension Connect installation, install as the
circled section of Fig. 2-7-E.
Fig. 2-7-C
Tension Band
Tension Connect
Fig. 2-7-D
[OK]
[NG]
Tension Connect
Tension Band
Tension Connect
Tension Band
Fig. 2-7-E
Tension Connect
Main Chassis
Tension Arm Ass’y
Fig. 2-7-A
Summary of Contents for HR-J6009UM
Page 2: ......
Page 6: ......
Page 54: ......
Page 55: ......
Page 56: ...VICTOR COMPANY OF JAPAN LIMITED VIDEO DIVISION Printed in Japan S40894 ...