2-16
2. How to install
(1) Align the notch of the loading arm gear (take-up side) to
the projection B of the loading arm gear shaft and slip it
over. Then rotate it clockwise for alignment with the pro-
jection A and slip it down to the bottom. (See Fig.2-2-
33.)
(2) Then turn the loading arm gear (take-up side)
counterclockwise. Hang the torsion arm on the pole base
assembly (take-up side) and tighten the screw (B).
(3) Install the loading arm gear (supply side) so that the guide
mark of the loading arm gear (take-up side) is in align-
ment with the guide mark of the loading arm gear (sup-
ply side). Then hang the torsion arm on the pole base
assembly (supply side) and tighten the screw (A). (See
Fig.2-2-32.)
Fig. 2-2-33
Projection A
Loading arm gear shaft
Loading arm gear (take-up side)
Projection B
2.2.17 Take-up Lever, Take-up Head and Control Plate
Guide
(1) Remove the spring of the take-up lever from the main
deck.
(2) Remove the lug (A) of the take-up lever from the main
deck and pull out the take-up lever and the take-up head
together.
(3) Remove the screw (A).
(4) Align the idler arm assembly pin in the center of the R
section of the control plate guide, remove the control
plate guide lugs (B) and (C) from the main deck, and re-
move the control plate guide.
Fig. 2-2-34
Take-up head
Screw(A)
Lug(A)
Lug(B)
Control plate guide
Take-up lever
Lug(C)
Idler arm assembly pin
2.2.18 Capstan Brake Assembly
1. How to remove
(1) Move the lug (A) of the capstan brake assembly in the
arrow-indicated direction so that it comes into alignment
with the notch of the main deck. (See Fig. 2-2-35.)
(2) Remove the lug (B) of the capstan brake assembly from
the main deck and remove the capstan brake assembly.
Fig. 2-2-35
Capstan brake assembly
Lug(A)
Lug(B)