W W W . K A A R T A . C O M
9
Figure 8: Upper Vehicle Mount Assembly first outside support arm deployment.
4.
Repeat 2 and 3 above with the stowed outside Upper Support Arm at the other end
of the Top Cross Rail (Figure 9).
OUTSIDE UPPER SUPPORT
ARM
M8 X 16MM LONG SOCKET
HEAD FASTENER
TOP CROSS RAIL