6. Depending on the thickness of the container, additional cable guides may
be necessary to ensure the cables are suffi ciently restrained. Some possible
locations are shown in Figure 16. Install additional guides as needed, and route
the LCD and generator cables through them to ensure that the cables do not
get routed through the “KEEP CLEAR” area, over the Zebra connector, or near
where the geared end of the dial hub will project through the dial ring cover.
Note:
See Appendix B for more detail on routing the cables.
INSTALLATION OF THE
DIAL RING COVER
1. Align the dial ring cover with the dial ring so that the generator will seat into
the fi ve o’clock position and the four aligning lugs align with the corresponding
slots in the dial ring. (See Figures 16 and 17.)
2. Carefully slide the dial ring cover into the dial ring.
3. Hold the dial ring cover in place and tighten the two dial ring cover mounting
screws to the specifi ed torque.
CUTTING AND INSTALLING THE SPINDLE
1. Ensure that the lock bolt is extended and remove the cam from the lock case.
2. Check the stepper motor gear positioning.
Note:
To avoid unnecessary damage, always make sure that the motor gear
is in its proper detent position (see Figures 18 and 19) when inserting the drive
cam. If it is not, a pencil may be used to move it to the proper position. This
must be done with the lock bolt extended.
Figure 16 - Cable Guide Locators
Figure 17 - Dial Ring Cover
Generator