Version 02/15/2016
Page 30 of 40
Mounting instructions 82132/3xxx CB 30
12.2
Bores and cabinet cutouts for input unit
To install the input unit, first 3 holes with M4 thread must be drilled according to Figure 31 respectively. Two screw connection
options have been given. They are shown in Figure 31 as I and II. Depending on the installation position, the keypad has to be
rotated according to Table 11, if necessary.
In addition to that, another cutout is required in the cabinet door, used as cable passage for the connecting cable (12) between
lock (1) and input unit (8 + 11). The size of the cable passage hole must not be more than 100 mm
2
(e.g. a hole max. 11.25 in
diameter), and the hole must be positioned within the area of Figures 32.
Installation position
Figure
Rotation
32
Not required
32
90° clockwise
32
90° counterclockwise
32
180°
Table 11: Installation position input unit
Figure 31: Holes in operating unit and possible range for cable passage
Possible range for cable
cutout <100 mm
2
I
II