Precondition The machine is switched off.
The machine is installed on level ground,
the machine has cooled down.
Air consumers are disconnected,
the outlet valves are open,
the machine is fully vented, the pressure gauge reads 0 psig!
➤ Follow all instructions.
10.9.1 Maintain rubber sealing strips
Material Cleaning cloth
Silicone or Vaseline
The rubber sealing strips inside the enclosure seal against rain water and additionally reduce noise
emissions. Care of the rubber sealing strips is especially necessary prior to winter to prevent the
strips from sticking and tearing when the enclosure is opened.
1. Open the enclosure.
2. Carefully clean all rubber sealing strips using a lint-free cloth.
3. Check the rubber sealing strips for cracks, holes and other damage.
4. Grease all rubber sealing strips.
Rubber sealing strips are damaged.
➤ Have an authorized KAESER service representative replace the damaged rubber sealing
strips.
10.9.2 Checking function of closed enclosure
1. Close all enclosure.
2. Lock all snap fasteners.
The enclosure does not properly rest on the body or cannot be locked.
➤ Contact an authorized KAESER service representative.
10.9.3 Checking connecting elements of enclosure
Material Acid-free oil
The connecting elements of the enclosure may include:
■ Screw connections
■ Hinges
■ Grip
■ Snap fasteners
■ Gas struts
1. Check all connecting elements of the enclosure for damages, wear, and firm seating.
2. If necessary, grease the hinges.
10 Maintenance
10.9 Check wing doors
156
Operator Manual Portable Rotary Screw Compressor
MOBILAIR M55 PE SIGMA CONTROL SMART pV
No.: 902366 10 USE