10.3.2.1 Maintenace tasks on the machine after commissioning
➤ Carry out maintenance tasks according to the following schedule.
Component:
Task
E50
Note
Engine:
Check the fuel lines and clamps.
If necessary, tighten the hose
clamps.
X
KS; SW
E50 = after the first 50 operating hours
KS = contact KAESER SERVICE; SW = contact specialised workshop
Tab. 72 Maintenace tasks on the machine after commissioning
10.3.2.2 Maintenance tasks on the chassis after commissioning
The table below lists maintenance tasks required after commissioning.
➤ Carry out maintenance tasks according to the following schedule.
Component:
Task
After first trip under load
K50
K100/A250 *
see chapter
Note
Chassis:
Re tighten the wheel nuts/bolts.
X
X
Re-tighten the screws of the
towing mechanism.
X
X
Have brake system inspected
and adjusted, if necessary.
X
KS; FW
K50 = after approx. 30 driven miles; K100 = after approx. 60 – 150 driven miles
A250 = every 250 h, at least annually; * Whichever occurs first
KS = call KAESER SERVICE; SW = specialised workshop
Tab. 73 Maintenance tasks on the chassis after commissioning
10.3.3 Regular maintenance tasks
The following table lists the various maintenance intervals.
Maintenance interval
Short description
Daily
–
Every 250 h, at least annually
A250
Every 500 h, at least annually
A500
Every 1,000 h, at least annually
A1000
Every 2,000 h, at least every two years
A2000
10 Maintenance
10.3 Maintenance schedules
No.: 901765 05 USE
Operator Manual Screw Compressor
M114 SIGMA CONTROL SMART
99