To be checked
see chapter
Confirmed?
Close the tap on the frost protector.
Tab. 69 Low-temperature equipment checklist
7.5 Option ga
Putting the generator into operation
The generator can be operated without earthing.
Test the insulation monitoring daily with the motor running before putting the generator into opera‐
tion.
Fig. 22 Insulation monitoring – 400 V three-phase Generator
Fig. 23 Insulation monitoring – 230 V three-phase Generator
1
«Main switch»
2
«Operating mode selector switch»
3
Test button with
earth leak warning lamp
for «insulation monitoring»
4
«Mains circuit breaker»
(«Circuit breaker» designed as automatic
circuit-breaker with shunt trip)
5
Three-phase power sockets
6
Single-phase power sockets
7
Initial Start-up
7.5
Putting the generator into operation
66
Operator manual Portable compressor
M 64
No.: 9_5898 26 E