Initial Start
7 --- 23
-
During installation of the compressor unit, ensure that a distance of at least 40 ” is
kept between the cooling air intake of the unit and any wall.
Check the oil level in the oil separator tank (see chapter 9.12).
-
Check that the airend rotates in the correct direction (see chapter 7.4).
Check the tension of the drive belts (see chapter 9.4).
The ball valve (6.6, see chapter 5.3) must be closed.
The ball valve (20, see chapter 5.3) must be open.
Lock the main disconnect in the ”off” position in accordance with ap-
plicable lock out/tag out procedures (example: OSHA CFR 29
§ 1910.147) to ensure the compressor does not restart.
Check all screws on the electrical connections for tightness and
tighten if necessary (carry out this check again after 50 hours of oper-
ation).
-
This compressor is fitted with a run ---in oil filter cartridge. Replace the filter cartridge
after the run ---in period of 200 hours (see chapter 9.11).
Summary of Contents for SK 19
Page 10: ...Technical Specification 1 6 ...
Page 19: ...Construction and Operation 5 15 ...
Page 20: ...Construction and Operation 5 16 ...
Page 64: ...Appendix 11 60 11 Appendix 11 1 Wiring Diagram ...
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Appendix 11 77 11 2 Spare Parts List ...
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......