Maintenance
9 --- 39
Do not use a tool as this may cause damage to the oil filter cartridge
and the gasket.
Check the oil level (see chapter 9.12).
Open the isolation shut ---off valve between the compressor and the compressed air
system.
Perform a test run
When the operating temperature is reached (see chapter 1.1), shut
down the compressor package (see chapter 8.3) and lock the main
disconnect in the ”off” position in accordance with applicable lock out/
tag out procedures (example: OSHA CFR 29 § 1910.147) to ensure the
compressor does not restart.
Afterwards, carry out a visual check for leaks.
9.12
Oil Top ---Off
Check the oil level weekly with the oil level sight gauge when the compressor unit is shut
down. If necessary, top off the oil to the maximum level. To do this, it is imperative that the
compressor unit is switched off under full load conditions and that the oil level is allowed to
settle for five minutes. Do not exceed the maximum level.
Stop the compressor package under full load (see chapter 8.3).
Lock the main disconnect in the ”off” position in accordance with ap-
plicable lock out/tag out procedures (example: OSHA CFR 29
§ 1910.147) to ensure the compressor does not restart.
Before opening or removing pressurized components (pipes, hoses,
tanks, etc.) it is imperative that the compressor package is completely
depressurized.
Venting the compressor package (see chapter 9.10).
Attention!
Summary of Contents for SM 8
Page 9: ...Technical Specification 1 6...
Page 16: ...Construction and Operation 5 13...
Page 17: ...Construction and Operation 5 14...
Page 54: ...Appendix 11 51 11 Appendix 11 1 Wiring Diagram...
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 74: ...SM 8 SM 11 A 08 B 07 C 14 D 11...
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ......