Installation
LFIS-B-1211
50
Installation
Part 4
Installation
1.
Installation Procedure .................................................... 51
2.
Location selection .......................................................... 52
3.
Indoor unit installation ................................................... 53
4.
Outdoor unit installation (Side Discharge Unit) ............ 63
5.
Refrigerant pipe installation ........................................... 65
6.
Drainage pipe installation .............................................. 68
7.
Vacuum Drying and Leakage Checking ........................ 72
8.
Additional refrigerant charge ......................................... 73
9.
Engineering of insulation ............................................... 74
10.
Engineering of electrical wiring ..................................... 76
11.
Test operation ................................................................. 77
Summary of Contents for SUPER DC INVERTER SERIES
Page 1: ...Contents i New Energy Requirement SUPER DC INVERTER SERIES Service Manual 2012 LFIS B 1211 ...
Page 2: ...ii General Information ...
Page 4: ......
Page 17: ...LFIS B 1211 Service Space Indoor Units 13 3 Service Space 1000mm 1000mm 1000mm 1000m m ...
Page 23: ...LFIS B 1211 Field Wiring Indoor Units 19 9 Field Wiring ...
Page 36: ...Duct Type LFIS B 1211 32 Indoor Units 10 Field Wiring ...
Page 40: ...Duct Type LFIS B 1211 36 Indoor Units 3 Service Space ...
Page 44: ...Field Wiring LFIS B 1211 40 Part 3 9 Field Wiring ...
Page 50: ...Wiring Diagrams LFIS B 1211 46 Part 3 KOU 36HFN1 RRC4 ...
Page 100: ...Troubleshooting LFIS B 1211 96 Electrical Control System 2 4 2 3 Up down panel is not closed ...