Indoor unit installation
LFIS-B-1211
54
Installation
Drill four holes of Ø12mm, 45~50mm deep at the selected positions on the ceiling. Then embed the
expansible hooks (fittings).
3.1.4 Install the main body
Make the 4 suspender through the 4 hanger of the main body to suspend it. Adjust the hexangular nuts on
the four installation hooks evenly, to ensure the balance of the body. Use a leveling instrument to make sure
the levelness of the main body is within
±
1
°
.
Adjust the position to ensure the gaps between the body and the four sides of ceiling are even. The body's
lower part should sink into the ceiling for 10~12 mm. In general, L is half of the screw length of the
installation hook.
Locate the air conditioner firmly by wrenching the nuts after having adjusted the body's position well.
Summary of Contents for SUPER DC INVERTER SERIES
Page 1: ...Contents i New Energy Requirement SUPER DC INVERTER SERIES Service Manual 2012 LFIS B 1211 ...
Page 2: ...ii General Information ...
Page 4: ......
Page 17: ...LFIS B 1211 Service Space Indoor Units 13 3 Service Space 1000mm 1000mm 1000mm 1000m m ...
Page 23: ...LFIS B 1211 Field Wiring Indoor Units 19 9 Field Wiring ...
Page 36: ...Duct Type LFIS B 1211 32 Indoor Units 10 Field Wiring ...
Page 40: ...Duct Type LFIS B 1211 36 Indoor Units 3 Service Space ...
Page 44: ...Field Wiring LFIS B 1211 40 Part 3 9 Field Wiring ...
Page 50: ...Wiring Diagrams LFIS B 1211 46 Part 3 KOU 36HFN1 RRC4 ...
Page 100: ...Troubleshooting LFIS B 1211 96 Electrical Control System 2 4 2 3 Up down panel is not closed ...