Indoor unit installation
LFIS-B-1211
56
Installation
Tighten the screws under the panel hooks till the panel closely stick on the ceiling to avoid condensate
water.
Hang the air-in grill to the panel, then connect the lead terminator of the swing motor and that of the control
box with corresponding terminators on the body respectively.
Install the 4 corner covers back.
Note: The panel shall be installed after the wiring connected.
Summary of Contents for SUPER DC INVERTER SERIES
Page 1: ...Contents i New Energy Requirement SUPER DC INVERTER SERIES Service Manual 2012 LFIS B 1211 ...
Page 2: ...ii General Information ...
Page 4: ......
Page 17: ...LFIS B 1211 Service Space Indoor Units 13 3 Service Space 1000mm 1000mm 1000mm 1000m m ...
Page 23: ...LFIS B 1211 Field Wiring Indoor Units 19 9 Field Wiring ...
Page 36: ...Duct Type LFIS B 1211 32 Indoor Units 10 Field Wiring ...
Page 40: ...Duct Type LFIS B 1211 36 Indoor Units 3 Service Space ...
Page 44: ...Field Wiring LFIS B 1211 40 Part 3 9 Field Wiring ...
Page 50: ...Wiring Diagrams LFIS B 1211 46 Part 3 KOU 36HFN1 RRC4 ...
Page 100: ...Troubleshooting LFIS B 1211 96 Electrical Control System 2 4 2 3 Up down panel is not closed ...