LFIS-B-1211
Refrigerant pipe installation
Installation
65
5. Refrigerant pipe installation
5.1 Maximum pipe length and height drop
Considering the allowable pipe length and height drop to decide the installation position. Make sure the
distance and height drop between indoor and outdoor unit not exceeded the date in the following table.
Model
Max. Length
Max. Elevation
24,000Btu/h-30,000Btu/h
50m
25m
36,000Btu/h-48,000Btu/h
65m
30m
5.2 The procedure of connecting pipes
5.2.1 Choose the pipe size according to the specification table.
5.2.2 Confirm the cross way of the pipes.
5.2.3 Measure the necessary pipe length.
5.2.4 Cut the selected pipe with pipe cutter
Make the section flat and smooth.
90
Lean
Crude
Burr
o
5.2.5 Insulate the copper pipe
Before test operation, the joint parts should not be heat insulated.
5.2.6 Flare the pipe
Insert a flare nut into the pipe before flaring the pipe
According to the following table to flare the pipe
Pipe diameter
Flare dimension A (mm)
Flare shape
Min
Max
1/4" (6.35)
8.3
8.7
R0.4~0.8
A
45¡
ã
90
°
4
-+
3/8" (9.52)
12.0
12.4
1/2" (12.7)
15.4
15.8
5/8" (15.9)
18.6
19.1
3/4" (19)
22.9
23.3
After flared the pipe, the opening part must be seal by end cover or adhesive tape to avoid duct or
exogenous impurity come into the pipe.
5.2.7 Drill holes if the pipes need to pass the wall.
5.2.8 According to the field condition to bend the pipes so that it can pass the wall smoothly.
5.2.9 Bind and wrap the wire together with the insulated pipe if necessary.
5.2.10 Set the wall conduit
5.2.11 Set the supporter for the pipe.
Summary of Contents for SUPER DC INVERTER SERIES
Page 1: ...Contents i New Energy Requirement SUPER DC INVERTER SERIES Service Manual 2012 LFIS B 1211 ...
Page 2: ...ii General Information ...
Page 4: ......
Page 17: ...LFIS B 1211 Service Space Indoor Units 13 3 Service Space 1000mm 1000mm 1000mm 1000m m ...
Page 23: ...LFIS B 1211 Field Wiring Indoor Units 19 9 Field Wiring ...
Page 36: ...Duct Type LFIS B 1211 32 Indoor Units 10 Field Wiring ...
Page 40: ...Duct Type LFIS B 1211 36 Indoor Units 3 Service Space ...
Page 44: ...Field Wiring LFIS B 1211 40 Part 3 9 Field Wiring ...
Page 50: ...Wiring Diagrams LFIS B 1211 46 Part 3 KOU 36HFN1 RRC4 ...
Page 100: ...Troubleshooting LFIS B 1211 96 Electrical Control System 2 4 2 3 Up down panel is not closed ...