Page 3 of 16
2019
/09
/11
K&K Single point swing # 040720001 - Instruction
1. Assign location of equipment considering the minimum space requirements (impact
2. Excavate soil for foundations, according to drawing. Please note: To achieve maximum
stability and a safe installation, a moderate level of soil solubility is required.
3. Pour in a drain layer of gravel of approx. 10 cm thickness between the bottom of the
swing posts and plain base of foundation.
4.
At first, mount two opposite swing posts to the junction, according to drawing. Raise
the unit by using an appropriate lifting gear.
5.
Afterwards, mount the remaining two posts to the junction, place the whole unit into
6. Grout foundations with compressed concrete C20/25, chamfer and round off the edges
7. CAUTION: Inspection and maintenance of the foundations may require access to the
foundations below the playing level (see also the maintenance instructions).
8.
After concrete foundations have set, attach chains to the swivel of the universal joint of
the swing axle as follows: (see detail).
• Unscrew 4x dog point screw (M16-stainless steel) at the side of the swivel.
• Pull out the U-link downwards.
• Put the last chain link in the U-link.
• The dog point screw has to be lubricated slightly with installation paste (lubricating
• Fix the U-link with the dog point screw.
• If necessary, shorten length of chains in order to ensure minimum ground clearance
of 0,50 m beneath the swing seat.
• The dog point screws have to be hand tightened e.g. with an Allen key or a catch wit-
9. Check all screw connections according to maintenance instructions after 4-5 weeks and
Please ensure that all special tools (e.g. Allen key for secured Allen screws etc.) and all spe-
cific documents which are or may be useful for safety management acc. to EN 1176-7 (e.g.
Age range recommended: from 8 years / public playground
Particular tools: ladder / lifting gear
Kaiser & Kühne Freizeitgeräte GmbH
Im Südloh 5 - 27324 Eystrup
+49 4254 93150
info@kaiser-kuehne-play.com