background image

VIVO VIT

A

 

Installation Instructions

Bathtub Models

D

E

I

F

GB

PRC

8

INSPECTION OPENINGS

For data on size and position of inspection openings see 
also the Installation Instructions page 7.

BATHTUB MODEL
CENTRO DUO OVAL 

127/128 

A

CENTRO DUO 2 

131/135 

A

CENTRO DUO 1 

129/130/136/137 

A

CENTRO DUO 

132/133 

A

CENTRO DUO 6 

134 

B

MEGA DUO OVAL 

184 

A

MEGA DUO 

180 

A

MEGA DUO 6 

182 

B

PLAZA DUO 

190/192 

A

PUNTA DUO 3 

910 

C

CLASSIC DUO 

105/107/109/110/114  A

CLASSIC DUO OVAL 

111/113 

A

CLASSIC DUO OVAL WIDE 

115 

A

CONO DUO 

732/733/734/735 

A

ASYMMETRIC DUO 

740/742/744 

A

PURO 

652/653/656/657/ A 

 683/684/687/688/ 

 691/692/696/697
RONDO/STAR 

700/701/710/711 A

RONDO 6/STAR 

706/707/716/717 

B

RONDO 8/STAR 

708/709/718/719 

B

VAIO DUO OVAL 

951 

A

VAIO 6/STAR 

958/959 

B

VAIO DUO 

950 

A

VAIO DUO 3 

962 

C

VAIO DUO 6 

952 

B

VAIO DUO 8 

953 

B

INSPECTION OPENING A

INSPECTION OPENING B

INSPECTION OPENING C

POINTING THE CASING JOINTS

After the functional check, the casing can be sealed with 
the appropriate flexible sealing material (e.g. silicone, 
acrylic).

•  Point the continuous edge below the bathtub rim (A) 

with sealing material and let it rest until the sealing 
material has hardened completely (see manufacturer‘s 
instructions).

For the operation of the whirlpool it is absolutely 
necessary that air can circulate underneath the 
pool. The bottom edge (B) of the casing must not 
be pointed.

A

B

Reviews: