9
Physical Installation
Planning the Installation
Ventilation and Clearance
Use the following guidelines when installing system components to ensure
proper clearance and ventilation. These guidelines apply to all installations
including rack mounting. (Rack-mount hardware sold separately.)
1.
Mount components in a location with adequate ventilation.
2.
Check for proper grounding if installing components in a rack.
3.
Maintain a 2 in. (5 cm) clearance in back and a 1 in. (2.5 cm) clearance
in front and on the sides.
Power Requirements
Kaleidescape component power supplies are universal input and operate on
any nominal line voltage between 100
–
240 V, and frequency between 50
–
60
Hz. Verify that power outlets are grounded, and preferably shielded from power
surges and brownouts.
Kaleidescape recommends a grounded outlet with a high-quality surge protector
for the power source for players and servers. A UPS is optional.
Network Requirements
A Gigabit Ethernet network is required. Connect Strato C using a shielded
Ethernet cable.
Audio and Video components
Before beginning the installation, determine the type of the display and
audio equipment that will connect to your Strato C.
Strato C supports the following outputs:
Video
High-Definition Multimedia Interface (HDMI). HDMI 2.0 and HDCP 2.2
are required for 4K Ultra HD content. HDMI 2.0a is required for HDR.
Audio
HDMI (Digital stereo or multi-channel)
Coaxial (Digital stereo or multi-channel)
Optical (Digital stereo or multi-channel)