65
GB
Scheme 02 :
the boiler is connected to a technical w
ater puffer
.
The boiler is switched off when the upper contact (thermostat) is satisfied.
The boiler is switched on when the lower contact (thermostat) is not satisfied.
The heating w
ater will then be tak
en from this puffer by means of the pumps and the relays are not controlled by the boiler control unit.
a)
a)
To set the boiler w
ater temper
ature
, press the
. Increase or decrease the degrees with the
and
.
b)
To set the desired temper
ature in the room (using the probe on the board) press the
ke
y.
Increase or decrease degrees with the
and
ke
ys.
c)
To set the work power
, press the
k
ey and adjust it with the k
eys
and
.
The rinsing from the stand-by state occurs automatically when a heat increase is required to return to satisfy the chosen stand-by condition (when this is set to ON)
or when there is a risk of hot w
ater inside the puffer
.
1
1
1 = ON / OFF thermostat on
DHW
tank
the scheme is indicative and w
ants to demonstr
ate
only the components that can be managed by
the boiler
. Any relay pumps must be controlled
separ
ately from the boiler
Summary of Contents for Alessia
Page 47: ...93 GB NOTES Cod 001143...