KALVIS – 6MPP      2009.05.18 

 

When boiler is mounted outside the territory of Lithuania, mountign and 

installation should proceed according to relevant national regulations. 

Error Reason 

Solution 

Boiler overheats 

Too intense combustion.  
Power outage (for systems 
with enforced circulation) 

Close air supply. Monitor boiler 
temperature. 
When temperature drops return to 
regular combusiton mode. 

Power outage 

  

Call serviceman.  
In case of a risk of system freezing, 
during prolonged power outage, drain 
water from the boiler 

Boiler does not reach 
nominal output 

Humid fuel. 
Insufficient draught. 

Use dry fuel. 
Check chimney draught, clean the 
chimney. 

Boiler „weeps“ 

Bad fuel. 
Too low return water 
tmeperature 
(>57

°

C !). 

Use dry fuel. 
Adjust mixing valve. 

Too high pressure 

Boiler overheats. Protection 
valve malfunctions. 

Close air supply, monitor water 
temperature.  
Check and replace protection valve. 

 

4.1 Fire precautions: 

*

 

Boiler should be placed on an incombustible material; 

*

 

If boiler is connected to the chimney by metal pipes, pipes should not be 
thinner than 1,5mm and they have to be covered by thermal insulation 

Attention !

 

When chimney’s draught is too great and sawdust is used for fuel sparks 

may fly out through the chimney. 

It is prohibited to use sawdust for fuel, if the distance between chimney 

and flammable roof or other flammable structures is less than 20 m.  

4.2. Requirements for chimney:  

Chimney design and boiler connections into it are shown on the fig 3a, 

3b and  and 3c. 

 

6.

 

Safety precautions 

 

 

3a fig. 

Boiler to chimney connection. 

* not less than 60

°

     A - incorrect     B – correct 

3b fig.  

Chimney insert installation 

 

Prohibited: 

 

Disassemble boiler or electric installation; 

 

Connect boiler to the system without protection valve, that keeps 
pressure in the system below 0,15MPa (1,5 kgf/cm

2

); 

 

Close hot or return water valves when boiler is operated; 

 

Store dry fuels or other combustible materials close to or on top of the 
boiler; 

 

Store fuel closer than 500 mm to boiler; 

 

Ignition fuel with combustible liquids (petroleum, kerosene etc.); 

 

Operate boiler with doors and covers open; 

 

Open burner while boiler is operated; 

 

Allow children to be by the working boiler without adult supervision; 

 

Operate boiler without having it grounded; 

 

Rapidly open loading doors during combustion (open a little, wait, then 
slowly open wide); 

 

Operate boiler with tank cover opened or non hermetic pellet supply 
hose; 

 

Clean or service boiler when electric power is on. 

7.

 

Consumables 

Fire grate and cast iron door may burn up, especially if user combusts 

coal, serivicing door and servicing cover fiber gasket may wear out.  

Summary of Contents for 6 MPP

Page 1: ...20 Barcode CENTRAL HEATING BOILER ON SOLID FUEL KALVIS 6 MPP WITH PellX BURNER USER S MANUAL LST EN 303 5 9817 95 ST 144948958 13 2004...

Page 2: ...the fireplace determine the defects and remove them If the aforementioned defects are due to wrong installation and operation of the fireplace I shall cover the arrival costs of your representatives _...

Page 3: ...l fired Saw dust pellets max diameter 6 8 mm Fire wood waste wood coal saw dust and peat briquettes coal Heated area up to m2 200 Fuel load dm3 470 50 Max wood length mm 380 Combustion duration wood f...

Page 4: ...nd ST 144948958 13 2004 12 2 Manufacturer applies the following warranty terms from the date of sale Boiler frame 24 m n Complement 12 m n Consumables para 7 6 m n Manufacturer is obliged to remove al...

Page 5: ...the boiler there is a draught adjuster p 1 that controls air damper p 6 thermomanometer p 2 doors p 4 with servicing doors p 5 behind them and an ash tray p 7 Fuel loading chamber is closed with a co...

Page 6: ...fly out through the chimney It is prohibited to use sawdust for fuel if the distance between chimney and flammable roof or other flammable structures is less than 20 m 4 2 Requirements for chimney Chi...

Page 7: ...be not less than that of the boiler smoke pipe and bending radii not less than 100mm Pipe from the smoke pipe to chimney has to be not longer than 1 5 m and lean upwards toward chimney Joints have to...

Page 8: ...the boiler significantly It is prohibited to fire boiler with fine waste wood due to explosion risk 13 KALVIS 6MPP 2009 05 18 5 1 System preparation for heating Fill system with softened or desalinate...

Page 9: ...12 9 KALVIS 6MPP 2009 05 18...

Page 10: ...10 11 KALVIS 6MPP 2009 05 18...

Reviews: