6.5.  Boiler equipment servicing periodicity 

Table 2 

No 

Equipment (part name) 

Service operation 

Periodicity 

Remarks 

Heat exchanger 

Heat exchanger flushing 

Once in 2 years 

Or as required 

Change of door sealing rope 

Once a year 

Or as required 

Heat exchanger door gear 

Lubrication 

Once a 3 months 

 

Protective valves 

Manual opening 

Once a day 

 

Closing fittings 

Closing and opening 

Once a week 

 

Ash pushing mechanism 

Inspection, cleaning if 

needed 

Once a month 

Depending on fuel type and quality  

Ash container 

Inspection, cleaning if 

needed 

Once a 2 

– 5 days 

Depending on fuel type and quality 

and boiler power 

Cleaning gear drives 

Inspection 

Once a 3 months 

 

Multicyclone 

Inside cleaning 

Once a 3 months 

In line with the instructions of given 

unit operation manual  

Burner 

Inspection 

Once a month 

10 

Fuel supply auger 

Inspection, inside cleaning 

Once a 3 months 

11 

Smoke exhauster  

Cleaning 

Once a year 

12 

Draught measurement 
equipment 

Inspection, inside cleaning 

Once a 2-4 weeks 

Depending on fuel type and quality  

 

 

It  is  recommended,  that  stokers  filled  boiler  house  working  log  regularly,  writing  down  the  main  boiler 

operation mode data at a  set periodicity: supply and  return  water  temperatures, pressure, scheduled boiler 
service tasks.  

Hopper  and  auger  conveyor  operation  is  carried  out  according  to  the  operation  conditions  specified  in 

their installation and service manuals (enclosed with the equipment).

 

6.6.  Most common boiler operation faults and what to do  

Table 3  

No 

Potential problems 

Cause 

What to do 

1. 

Condensate leaks 
from the boiler, 
resins form 

Too low temperature of water returning to 
the boiler 

Check operation of recirculation pump 

Adjust mixing valve 

2. 

Boiler fails to 
develop power 

Improper fuel 

Change fuel supplier 

Incorrectly adjusted burner 

Call manufacturer’s representative 

3. 

Smoke temperature 
is too high 

Heat exchanger is sooty 

Clear sooth away from hearth surfaces 

Sediment accumulation inside the heat 
exchanger 

Adjust heat exchanger cleaning device. 

Too high chimney draught 

Install/adjust smoke exhauster 

4. 

Constant water 
pressure reduction 
in the boiler 

Leaking welded joints 

Call manufacturer’s representative 

Equipment was damaged during 
transportation 

Incorrectly connected equipment 

During connection, follow the installation and service 
manual 

Corrosion or other chemical damage 

Use proper system water preparation method 
Use proper fuel 
Find and remove worn parts 

8. 

Failures of boiler 
drives and electrical 
control 

Control system failure 

Call manufacturer’s representative 

Ash removal augers are stuck 

If ash removal auger is stuck, eliminate its cause 

Drive (heat exchanger control, ash removal) 
failure 

Check state of the drives. Call manufacturer’s 
representative 

6. 

Sparks, smoke 
come out of the 
boiler (through 
doors and lids) 

Sealing ropes are worn 

Restore sealing by correcting rope (or other material) in the 
grooves or if this does not help use new rope 

Door not closed 

Remove foreign things from the door gap, then close boiler 
service doors and fasten them with handles 

Smoke exhauster is out  of operation 

Check smoke exhauster 

7. 

Burner will not turn 
on 

Emergency thermostat is active 

Controller failure. 
See fig. in controller manual * 

Fuel supply hose 
burned down 

Too highly set burner temperature 
Bad fuel is used 
Dirty burner 

Replace hose 

Too low draught 

Adjust smoke exhauster 

9. 

Jointed crankshaft 
axles. 

After opening the heat exchanger door, the 
turbulators are not properly placed in the 
sockets (see Fig. 8). 

Open the heat exchanger door, properly insert the turbulent 
(check the turbulent supports if necessary). 

*  See  fig. 

Burner  control  unit  PLUM  ecoMAX850P2-O  (or  KEY  RK-2006LPGP2)  for  Pellet  Boilers  Installation,  Maintenance,  Service  and 

Operation Manual

 

 

IT IS FORBIDDEN:  

-

 

To fill the system with cold water when the boiler is hot. 

-

 

To extinguish the boiler by pouring water into the hearth or burner. 

 

Summary of Contents for Kalvis-100MG

Page 1: ...SOLID FUEL WATER HEATING BOILER WITH PELLET BURNER KALVIS 100 MG 500 MG INSTALLATION AND SERVICE MANUAL LST EN 303 5 2012 20548 87 20548 93 Made in Lithuania Made in Lithuania...

Page 2: ......

Page 3: ...use it contact the seller Legend Important information or useful suggestions on installation or operation of the product Warnings about concerns for your health or property safety and correct operati...

Page 4: ...ical part of the boiler 13 5 4 Boiler commissioning 14 6 Boiler operation 14 6 1 Preparation for work 14 6 2 Fuel container filling 14 6 3 Stoking 15 6 4 Maintenance 15 6 5 Boiler equipment servicing...

Page 5: ...em with water The water in the heating system and boiler should not freeze up When boiler is in operation to close supply and return line valves To change the design of the boiler It is necessary to c...

Page 6: ...dangerous for further boiler operation or operating personnel vibration knocks inside the boiler noise exhaust gas explosions in the pipeline damaged fittings pipes etc In the case of sooth and fuel p...

Page 7: ...n note has to be made in this document under Installation Report Installed and connected boiler has to be checked by fire fighters It is strongly prohibited to fire the boiler without having filled it...

Page 8: ...ed according to the requirements of STR 2 01 02 2016 Projecting and Certification of Energy Performance of Buildings expressed for Energy Performance of Buildings Classes B and C 3 Using 8 wood pellet...

Page 9: ...burner L1 mm mm 1140 5 2990 5 1260 3110 1420 3350 1420 3650 Mass no more than 10 kg 2500 5 2580 3000 3420 1 Wood pellet quality shall be in line with DIN 51731 DIN plus standards 2 Energy quantity ca...

Page 10: ...orative panels 21 Ash container 22 Actuator for ash from boiler extraction auger 23 Protective screw connecting the ash removal auger with its actuator 24 Tray for ash from the boiler 25 Water outlet...

Page 11: ...stallation in the hearth door Distances from partitions are given in the boiler house project For maintenance of turbulizers and ash removal auger extraction leave a sufficient distance in front of th...

Page 12: ...iler on separate branches shall have smoke exhauster see fig 5 C It is prohibited to install one smoke exhauster for two or more boilers see fig 5 D Multicyclone is used to separate ash and other soli...

Page 13: ...east 5 minutes If as a result there are no leaks or weeping at maintained pressure this means that the boiler is fit for operation After completion of the test reduce pressure in the system down to th...

Page 14: ...peration In order to ensure proper operation of the equipment make sure to study all given boiler burner and control unit manuals 6 1 Preparation for work When firing the boiler it is necessary to che...

Page 15: ...ation about burner operation and control When boiler is operating in a stabile mode make sure that there are no water leakages knocks hydraulic shocks or penetration of discharged combustion products...

Page 16: ...ed via dismountable joints Dismountable joints are mounted as follows open the door of heat exchanger at a minimum just to insert hand take off each turbulizer and insert part of its dismountable join...

Page 17: ...3 Smoke temperature is too high Heat exchanger is sooty Clear sooth away from hearth surfaces Sediment accumulation inside the heat exchanger Adjust heat exchanger cleaning device Too high chimney dr...

Page 18: ...opes during operation can wear out burn out They are available in the shop or at manufacturer Also see fig ECO BURNER UNI MAX 100 1000 kW Pellet Burner Operation Manual The heat exchanger door rotatio...

Page 19: ...manufacturer s fault Burner guarantee service rules are described in ECO BURNER UNI MAX 100 1000 kW Pellet Burner User Manual In the case of boiler malfunction call by phone and when the firm s repres...

Page 20: ...e of malfunction we recommend the following contacts Company Address Telephone Manufacturer Kalvis UAB Pramon s 15 LT 78137 iauliai Lithuania Telephone 370 671 88891 E mail prekyba kalvis lt Guarantee...

Reviews: