7
Getting Started Quickly
The
Series
8000 rack systems are typically prewired and set up at the factory with all
measuring channels and function cards installed. To get started with the 8000 system you will
need to:
a
Install the sensors in the application or cal fixture
b
Connect the sensors to the enclosure (see page 30)
c
Connect the power cord and turn on the unit
d
If you have a display see page 32
e
If you have no display see page 29 on back panel I/O
As with any complex electronics system you should thoroughly familiarize yourself with all
manuals dealing with the product. Included with the system are the appropriate manuals for
any measuring channels and function cards purchased. Please refer to these manuals for
specific information.
Warning
: The integral power supply in racks utilize
high voltage
(120 or 240VAC). Unplug the unit before servicing.
Summary of Contents for SERIES 8000
Page 2: ......
Page 9: ...9 fig 1 Full 19 Subrack Rear Front Outline Drawing...
Page 10: ...10 Fig 2 Full 19 Subrack Top View Outline Drawing...
Page 11: ...11 fig 3 Full 19 Subrack Rear Front with Display...
Page 12: ...12 fig 4 Full 19 Subrack Rear Front with Dual Display...
Page 14: ...14 fig 5 Rack with Display Outline Drawing...
Page 15: ...15 fig 6 Rack Outline Drawing...
Page 16: ...16 fig 7 Rack with Display Outline Drawing...
Page 28: ...28 fig 15 Back Plane Template...
Page 34: ...34 fig 20 Dual 1 8 DIN Mounting Panel 814873 002...