KSW
Luftdurchlässe
Assembly, installation and operating instructions
14
7
Pre-commissioning checks
Before initial commissioning, check whether all the necessary conditions have been met so that the unit can function safely
and properly.
Structural tests
Check that the unit is securely standing and fixed.
Check the horizontal installation/suspension of the unit.
Check whether all components are properly fitted.
Check whether all dirt, such as packaging or site dirt, has been removed.
Air-side checks
Check whether there is unimpeded flow at the air inlet and outlet.
Summary of Contents for KSW
Page 2: ......