Venkon XL UL
Assembly, installation and operating instructions
20
6.4.1 Installation of basic unit
Note the Venkon minimum clearances when installing the basic units!
Highlight the dimensions and clearances of the key holes on the wall or ceiling as per the table, drill the holes and use
appropriate fixing materials to install the basic unit.
Align the basic unit for correct operation. Install the basic unit with a gradient on the condensation discharge side should
condensation be produced.
Once the basic unit has been aligned, prevent the fixing material from coming loose.
Venkon XL are fixed per unit at 4 points on the ceiling or on a construction provided by the customer. For this purpose, the
devices are suspended from the suspension brackets, e.g. from threaded rods (M8).
X
X
0.3
0.8
1.2
1
0.2
Dimensions suspension points [mm]
Dimensions suspension points [inch]
Fig. 4: Suspension points
6.4.2 Installation of casing
Summary of Contents for Venkon XL UL
Page 2: ......