Venkon XL
Beschreibung
Assembly, installation and operating instructions
25
Actuator with ‘First Open’ function
When delivered, the actuator is normally open in a de-energised state, thanks to the First Open function. This enables
heating mode to run even if the electric wiring is not yet completed.
When subsequently commissioned and with the application of power (for longer than 6 minutes), the First Open function
is automatically unlocked so that the actuator becomes fully operational.
0,5 mm
> 0,5 mm
< 0,5 mm
Power on
> 6 min
Power off
Fig. 16: “First Open” function
6.5.3 Connection of 2-way valve kit
1
2
2
1
1 Flow
2 Return
1 Flow
2 Return
2-way valve kit, straight,
2-pipe, connection on left
2-way valve kit, angled,
2-pipe, connection on left
Fig. 17: 2-way valve kit, 2-pipe
1 Flow, cooling
2 Return, cooling
3 Flow, heating
4 Return, heating
2-way valve kit, straight,
4-pipe, connection on left
2-way valve kit, angled,
4-pipe, connection on left
4
2
1
3
4
3
2
1
Fig. 18: 2-way valve kit, 4-pipe
Note:
Pipework and insulation is only shown for illustration purposes and is provided by others on site!
Summary of Contents for Venkon XL
Page 2: ......
Page 5: ...5 13 2 ERP Datenblatt Venkon XL 70...
Page 67: ...Venkon XL Beschreibung Assembly installation and operating instructions 67 13 Certificates...
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ...www kampmanngroup com hvac products fan coils venkon xl 02 20 ENSAP Nr 1374732...