INSTALLATION MANUAL OPERATION MANUAL INSPECTION LOG
KANNAD 406 AF-COMPACT
PAGE: 213
FEB 01/2008
6. ELT Connection
1.
Connect the cable of the outside antenna to the BNC connector of the
front panel.
2.
Connect the DIN12 connector of the Remote Control Panel cable to the
DIN 12 socket of the front panel.
3.
Set the 3-position switch of the front panel to ARM.
Figure 208: Installation, controls and connectors
• Perform the first power up procedure (
Refer to § 7. First power up, page
).
7. First power up
Note: Antenna and RCP must be connected.
Caution: never switch to ARM or ON if neither antenna cable nor 50 ohm load
is connected to the ELT (1. BNC connector), risk of ELT damage.
Perform the following tests:
1.
ELT operational tests:
• connect RCP to J1 and outside antenna to J2;
• switch the ELT from OFF to ARM;
• check that the Self-Test result is OK (one long flash).
2.
RCP operational tests:
Refer to § B. RCP operational tests, page 302
.
3.
406 & 121.5 MHz transmission tests (optional):
Refer to § C. 406 and 121.5 MHz transmission test, page 303
At the end of the first power up procedure, switch the ELT to ARM.
The ELT is now in stand by mode and ready to be activated:
• either automatically by G-Switch sensor if a crash occurs;
• or manually by RC200 Remote Control Panel.
Note : switching to ON directly on the ELT front panel will also
activate the ELT.