NanoParticle Nebulizer: Troubleshooting
Liquid NanoParticle Sizer User Guide
89
Version 1.0.1
Preparing the AFIMC for Shipping
To prepare the AFIMC for shipping, follow these instructions:
1.
Disconnect the aerosol sample tubes.
2.
Disconnect the communication cables.
3.
Turn off the power.
4.
Place all the caps that you received with the instrument on the inlets and
outlets to prevent material from entering the instrument. The AFIMC is
now prepared for shipping or moving.
Note:
If you did not save the original protective caps, find suitable
alternatives.
5.
Place the instrument in its original packing materials for shipping.
Preparing the Fast CPC for Shipping
To prepare the Fast CPC for shipping, follow these instructions:
1.
Disconnect and remove the n-Butanol fill bottle then empty it into an
appropriate container. (Note: To preserve the n-butanol, swap the supply
and exhaust connections so that the supply is drawing from the top of the
bottle and the exhaust is feeding the bottom.)
2.
Set the butanol flow in Prime mode.
3.
Place the empty bottle back in the bracket and reconnect.
4.
Operate the Fast CPC until the counts on the
Device Status
screen read 0.
5.
Disconnect the aerosol supply from either the
Aerosol In
fitting on the
front panel or from the high-performance aerosol inlet (beneath the
instrument).
6.
Disconnect the exhaust and make-up air tubing.
7.
Replace the aerosol inlet adapter elbow if not already in place.
8.
Turn off the power and unplug the power cable.
9.
Place all the caps that you received with the instrument on the inlets and
outlets to prevent contaminants from entering the instrument.
Note:
If
you did not save the original protective caps, find suitable alternatives.
10.
The Fast CPC is now prepared for shipping or moving.
11.
Place the instrument in its original packing materials for shipping.
If you have any questions about shipping or moving the Liquid NanoParticle
Sizer system, contact Kanomax FMT, Inc. at 651-762-7762. (Customers in Asia
please call +81 6-6877-0183.)