Page 30 / 71
Unit Functions
BR/BD 75/140 R, BR/BD 90/140 R
New Unit Information 03.2004
Brush head - BR version
Fresh-water distribution tube
The distribution tube (9) is located in front of the
front brush roller. It must be installed so that the
holes are facing slightly towards the rear.
Brush head from below
Brush head from above
8
6
10
11
9
5
Side sealing strip
6
Brush roller, front
7
Side sealing strip
8
Drive, rear brush roller
9
Fresh-water distribution pipe
10
Brush roller, rear
11
Drive, front brush roller
Brush head from above (REVISED)
Brush head from below
Fresh-water distribution tube
1
Terminal strip brush motors (EXT.X2)
2
Water inlet hose
3
Brush head, top bracket
4
Springs (3x)
1
3
4
2
5
7
9
REVISED