Page 68 / 71
Troubleshooting
BR/BD 75/140 R, BR/BD 90/140 R
New Unit Information 03.2004
Components
Modules
Working time
(Min.)
Note
Battery
30
Exchange only with a lift possible.
Tightening torque of the polls 23 Nm
±
1 Nm
Fuses F1-F4
10
Main control printed circuit board
Central battery connector
including EMERGENCY-
STOP
30
Disconnect the battery before replacing the
central battery connector and EMERGENCY-
STOP.
The EMERGENCY-STOP wire is routed under
the floor panel, behind the main control printed
circuit board cover to the instrument panel.
Key switch
15
control panel
Main control printed
circuit board
30
Use a antistatic-wristband during disassembly.
The wire plugs are coded, they can not be
incorrectly pluged in
Tightening torque, wire connections
M 6 nuts = 3,9 Nm
M 8 nuts = 9,0 Nm
Waterpump
20
Empty the fresh water tank or plug the inlet to the
pump before replacing.
Metering valve
45
Dissconect the hose kuppling and wire connector
The wire tie on the inlet hose must be replaced
after removing it.
Both micro switches are non-adjustable
.
See tech. data for flow volume.
Dirty water tank seal and
fluff strainer
10
Dirty water tank
Working time needed to replace important parts
ORIGINAL