22
English
9.808-230.0 Rev. 01 (03/20)
1 Suction turbine air channel
2 Seal float
Remove the air channel suction turbine.
Remove the seal of the float.
Installation information
Pay attention to the correct fitting position during reinstal-
lation.
1 Square with regulating knob water volume
2 Cover
Remove cover.
Remove square with regulating knob water volume.
1 Support
2 Screws
Unscrew the screws.
Remove the holders.
1 Water dosing valve
2 Seal
Remove the water dosing valve.
Installation information
Pay attention to the correct fitting position during reinstal-
lation.
ADWD Uninstall / install water dosing valve
Summary of Contents for BD 43/25 C Bp
Page 72: ...72 English 9 808 230 0 Rev 01 03 20 Note Ep variant Cable harness ...
Page 75: ...English 9 808 230 0 Rev 01 03 20 75 Indicator light voltage supply 9 763 122 0 ...
Page 150: ...Español 9 808 230 0 Rev 01 03 20 150 Nota Variante Ep arnés de cables ...
Page 226: ...Français 9 808 230 0 Rev 01 03 20 226 Remarque Variante Ep Faisceau de câbles ...