34
English
9.808-230.0 Rev. 01 (03/20)
Diagram
Bp variant:
1 Connection cable
2 Cable tie
Installation information
Secure the connecting cable using a cable tie.
Connecting cables must not be tensioned.
Diagram
Bp variant:
1 Cable conduit of the suction turbine support
Installation information
Lay the insulating tube as shown.
Diagram
Bp variant:
Suction turbine
1 Electric socket plug connections
Slide the protective hose over the lines.
Slide shrink hose over the lines.
Crimp lines W6 to the lines of the suction turbine.
Installation information
The crimping must be performed with suitable tools.
Brush motor
1 Electric socket plug connections
Slide the protective hose over the lines.
Slide shrink hose over the lines.
Crimp lines W5 to the lines of the brush motor.
Installation information
Connect cable ends with the same colour to each other.
The crimping must be performed with suitable tools.
Connect electric socket plug connections of suction turbine and brush motor
Summary of Contents for BD 43/25 C Bp
Page 72: ...72 English 9 808 230 0 Rev 01 03 20 Note Ep variant Cable harness ...
Page 75: ...English 9 808 230 0 Rev 01 03 20 75 Indicator light voltage supply 9 763 122 0 ...
Page 150: ...Español 9 808 230 0 Rev 01 03 20 150 Nota Variante Ep arnés de cables ...
Page 226: ...Français 9 808 230 0 Rev 01 03 20 226 Remarque Variante Ep Faisceau de câbles ...