Do not use any foreign additives, so-called
enhancing agents, because this will invali-
date the warranty.
1. Add distilled water one hour before the
charging process comes to an end. Ob-
serve the correct acid level according to
the battery label.
All cells must produce gas at the end of
the charging process.
Maintenance-free batteries (AGM and
gel batteries)
ATTENTION
Risk of damage when opening AGM and
gel batteries!
AGM and gel batteries are maintenance-
free and have a closed battery housing. Re-
filling them with distilled water or battery ac-
id is not possible and is not necessary.
Opening or drilling the battery housing will
damage an AGM or gel battery. It must then
be replaced.
Do not open the battery housing and do not
drill any holes.
Do not cover the pressure relief valve and
do not change it.
1. Only charge AGM and gel batteries us-
ing the specified chargers, see chapter:
Charging the battery
.
Installing and connecting batteries
CAUTION
Removing and installing the batteries
Unstable machine position
Ensure that the machine is positioned sta-
bly when removing and installing the batter-
ies.
ATTENTION
Incorrect connection polarity
Destruction of the control electronics
Take care to ensure the correct polarity
when connecting the batteries.
ATTENTION
Deep discharge
Risk of damage
Charge the batteries before starting the de-
vice.
1. Drain the waste water.
2. Pivot the waste water tank upwards.
3. Place the battery in the device as
shown.
Important:
Push the batteries all
the way back!
BD 80/100
:
170 Ah, 2.815-092.0
180 Ah, 2.815-101.0
240 Ah, 2.815-105.0
285 Ah, 2.815-095.0
1
Spacers
BD 70/75:
115 Ah, 2.815-091.0
170 Ah, 2.815-092.0
180 Ah, 2.815-101.0
1
Spacers
2
Battery holder
3
Additional weights
4. Insert a spacer between the right batter-
ies and the fresh water tank,
a
for 115 Ah battery set:
1 piece
lengthwise flat.
b
for battery sets other than 115 Ah:
2 pieces lengthwise upright on top of
each other.
5.
For BD 70/75 with 115 Ah battery set:
Insert the 4 additional weights.
6. Attach the battery fastener, to do so
a
for BD 70/75:
Install the 2 battery
holders and
for 115 Ah:
Tighten at the
left and middle threaded holes.
For
170 Ah / 180 Ah:
Tighten at the right
and middle threaded holes.
b
for BD 80/100:
Insert one or two
spacers flat lengthwise or vertically
between the front batteries and the
fresh water tank so that the batteries
cannot slip forward.
7. Connect the poles to the connection ca-
bles from the battery installation kit.
8. Clamp the connecting cables on the (+)
and (-) battery terminals that are still free.
9. Connect the device-side battery connec-
tor to the battery-side battery connector.
10.Pivot the waste water tank downwards.
Removing the battery
CAUTION
Removing and installing the batteries
Unstable machine position
Ensure that the machine is positioned stably
when removing and installing the batteries.
1. Turn the key-operated switch to "0" and
remove the key.
2. Disconnect the battery plug.
3. Drain the waste water.
4. Pivot the waste water tank upwards.
5. Disconnect the device-end cable from
the negative terminal of the battery.
6. Disconnect the remaining cables from
the battery.
7.
For BD 80/100:
Remove the spacer(s)
between the front batteries and the fresh
water tank.
8.
For 115 Ah battery set:
Take out the
additional weights.
9. Remove the battery.
10.Dispose of the used batteries in accord-
ance with statutory provisions.
Initial startup
Charging the battery
DANGER
Inappropriate use of the charger
Electric shock
Adhere to the mains voltage and fuse val-
ues specified on the device type plate.
Only use the charger in dry rooms with suf-
ficient ventilation.
ATTENTION
Accumulation of dangerous gases under
the tank during the charging process
Risk of explosion
Pivot the waste water tank upwards before
charging low-maintenance batteries.
ATTENTION
Using an unsuitable charger
Risk of damage
Do not connect the charger to the device-
side battery connector.
Use only a charger suitable for the type of
battery installed.
Read the operating instructions of the
charger manufacturer and observe the
safety instructions in particular.
The average charging time is approx. 10-
15 hours.
The device cannot be used during the
charging process.
Note
The device has deep discharge protection,
i.e. the brush motor and turbine are
switched off automatically when the permit-
ted minimum capacity level is reached.
1. Drive the device directly to the charger
and do not drive on slopes.
2. Pull out the device-side battery connec-
tor.
1
Battery plug, device side
2
Battery plug, battery side
Battery set
Capacity
Charger
2.815-091.0 115 Ah
6.654-367.0
2.815-092.0 170 Ah
6.654-436.0
2.815-101.0 180 Ah
6.654-434.0
2.815-105.0 240 Ah
6.654-437.0
2.815-095.0 285 Ah
6.654-419.0
Summary of Contents for BD 70 W Classic Bp
Page 2: ......