Commissioning
Water Distribution
Pressure Test
Pressure testing of the complete water
system shall be performed at a pressure of 1.3
times the designed pressure or according to
local standards. Testing should be done after
temperature equalization. The pressure must
be held constant for 2 hours.
Pressure Adjustment
The system is factory-adjusted to have an output pressure of 3
bar. To adjust the pressure, follow the instructions below. The
pressure must not exceed 6 bar.
To adjust water pressure (if required):
1.
Set the outlet pressure at least 1 bar below the inlet pressure.
2.
Close the ball valve on the input side.
3.
Reduce the pressure on the output side.
(e.g. by draining water)
4.
Close the ball valve on the output side.
5.
Loosen slotted screw.
Do not unscrew the slotted screw
6.
Slacken the pressure spring.
Turn the adjuster knob
(black) anti-clockwise (-) as far as it will go.
7.
Slowly open the shut-off valve on the input side.
8.
Turn the adjuster knob until the setting scale displays the
desired value.
9.
Re-tighten the slotted screw.
10.
Slowly open the ball valve on the output side.