85
Step 6: mount the Dahl locking plate by using the 5 high grade Dahl bolts on
to the chassis. Secure them with Loctite 222 and tighten them, but not too tight.
(20-24Nm).
Step 7: Place the battery box back into the chassis and connect the batteries
to the electronics.
Now, the Leon F chassis is ready to be docked into the Dahl Docking station.
Docking station in the vehicle:
The mounting of the Dahl docking station into your vehicle shall only be
executed by an authorized car adaptation company. They will get the right
support and information from Dahl Engineering how to mount the docking
station into the designated vehicle.
The special Dahl high grade Torx bolts (Dahl part no: 502800) only come
in one length which is often too long. They need to be cut into the right
length by the authorized engineer to fit the locking plate properly without
damaging the batteries.
Summary of Contents for Leon F Kameleon
Page 1: ...User manual Leon F Kameleon...
Page 2: ......
Page 10: ...2 3 Declaration of conformity Leon F Kameleon Series...
Page 95: ...87 Dahl docking station mounted on the floor Docking station and docking plate on chassis...
Page 100: ...92 Picture of improper belt fit Picture of proper belt fit...
Page 101: ...93...
Page 107: ...99...
Page 108: ...100 picture of improper belt fit picture of proper belt fit...
Page 131: ...123 NOTES...
Page 133: ......
Page 134: ......
Page 135: ......