11
B. INSTALLATION INSTRUCTIONS
b.1 Initial warnings
The device must be installed on a pavement that presents an adequate burden capacity. If the
existing building does not satisfy this requirement, appropriate measures (for instance a burden
distribution plate) must be taken.
The installation of the device must guarantee an easy access to clean the boiler, the exhausted
gas piping and the flue.
Extraction fans can cause problems, when used in the same room or space of the device.
b.2 Moving and transporting
Make sure that the devised used for lifting and transporting the boiler support its weight, which is
reported on the identity plate on the back of the boiler. The lifting of the boiler is normally
performed with an elevation trolley, by inserting the pitchforks in the proper slots of the wooden
packing. In order to position the boiler inside a room, a good general rule is to lay the boiler on the
floor gently, with maximum caution and avoiding any violent impact.
b.3 Positioning
For positioning the boiler, we suggest you to choose a spot that is as central as possible to the
area you wish to heat; this will facilitate a uniform distribution of the heat and will help obtaining an
optimum efficiency.
In order to connect the boiler to the waterworks, a performance by a qualified technician or
plumber is necessary. We recommend putting a floor-guarding plate close to the flue or to
inflammable materials (such as parquet or carpeting).
For safety reasons, maintain a distance of at least 20cm
between the hot sides of the boiler and possibly inflammable
covering materials (such as glass-beaded walls, wallpapers
et cetera); otherwise, use specific insulating materials,
available on sale.
L=20 cm min. B=20 cm min. R=20 cm min.
Summary of Contents for KK IDRO
Page 1: ...PELLET BOILER KK IDRO OPERATING AND MAINTENANCE HANDBOOK...
Page 13: ...13 100 100...
Page 15: ...15 ELECTRICAL SCHEME...
Page 31: ......