uBreakiFix Fixture Install & Maintenance Guide
7
STEP 1
Place the countertop onto the drawer unit assembly
and align with bolt holes below.
STEP 2
Insert furniture bolts (I) through the top of the drawer
unit assembly into the base of the countertops. Use
allen wrench to secure.
STEP 3
Insert the drop-in power trough and secure to
countertop with provided screws (J).
STEP 4
Run power into the power trough for easy access to
phone chargers.
STEP 5
Cash drawer comes pre-installed. Use the access
hole to connect for wiring.
STEP 6
Install the receipt & label printer on the pull-out shelf
in the rear cabinet on the right. The door height is
lowered to allow easy access to those items without
the cabinet needing to be opened.
COMPLETING THE WORK BENCH ASSEMBLY
Summary of Contents for asurion uBreakiFix Fixture
Page 16: ......
Page 17: ......
Page 19: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 28: ...Short Cabinet Workbench Drawer Assembly Workbench Co mm un ity Wa ll Bo x Fra me s ...
Page 29: ...Glass Panels K Wall Frames K Wall Frames Drawer Assembly Workbench Tech Gallery Panels ...
Page 30: ...Co mm un ity Wa ll Bo x Fra me s Tech Gallery Panels ...
Page 31: ...uBreakiFix Fixture Install Maintenance Guide 31 ...