[8]
Specification of CR-200Rf
(T218351-003-0E)
1. Crane Specification
(T218351-004-0E)
Maximum lifting capacity
:
20 ton
×
2.5m
Boom length
: 6.5m
-
28.0m
(6 section)
Jib length
:
4.0m, 5.8m
(
2 section, offset 7
°
-
60
°
)
Searcher hook (option)
1.0m
(High position and Low position)
Boom derricking angle
: -9.5
°
-
83
°
*Boom derricking time
:
35s/-9.5
°
-
83
°
*Boom extending speed
: 6.5m
-
28.0m/65s
*Hoisting line speed (winch up)
Main winch
:
115m/min
(
at 5th layer
)
Auxiliary winch
:
104m/min
(
at 3rd layer
)
*Hoisting hook speed (winch up)
Main winch (parts of line: 7)
:
16.4m/min
(
at 5th layer
)
Auxiliary winch
(parts of line: 1)
:
104.0m/min
(
at 3rd layer
)
*Slewing speed
: 2.9min
-1
*Speed/Time
:
Subject to no load
Wire rope for hoisting
Main winch;
Diameter
: 14mm
Length
: 155m
Auxiliary winch;
Diameter
: 14mm
Length
: 76m
Hydraulic system
Oil pump
:
4 pumps, plunger and gear type
Hoisting motor
:
Axial plunger type
Slewing motor
:
Axial plunger type
Cylinder
:
Double acting type
Control valve
:
Double acting with integral check and relief valves
Oil reservoir capacity
:
240L
Specification of CR-200Rf
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...