- 131 -
17. Drive operation devices
D
riv
e o
pe
ra
tio
n d
evi
ces
17-2-2 Switch section
(T218351-081-0E)
When a switch operation registers, it makes a "pip" tone and the color of the switch changes.
If there is some misoperation, the conditions for the operation have not been met, or for any other reason the switch
operation does not register, the misoperation warning buzzer "pip pip" will sound.
(1)
Way side lamp switch
When the way side lamp switch is pressed with the lighting switch
in the position of "
" or "
", the confirmation buzzer "pip"
sounds, the way side lamp lights and the color of the way side
lamp switch changes from blue to green.
When the color of the way side lamp switch is black, selection is
not available.
・
Press the switch firmly for at least 0.3 seconds.
・
If you attempt to press the switch with the lighting switch in the "OFF" position, the
misoperation warning buzzer "pip pip" will sound and the way side lamp will not light.
(T217051-097-0E)
(2)
Temperature/voltage confirmation and fuel consumption display screen mode switch
・
How to switch to the temperature/voltage confirmation screen
Switch to the temperature/voltage confirmation screen by pressing the temperature/voltage confirmation mode
switch on the initial screen.
It displays battery voltage, hydraulic oil temperature, torque converter oil temperature, PTO operating hour meter,
and other information.
If an error occurs, this display is also used to display an error screen.
If the voltage level is low, then voltage is displayed regardless of the PTO status.
This screen is displayed automatically if the hydraulic oil overheats while displaying the initial screen.
When the hydraulic oil overheats or the battery voltage drops
(
to 20V or less
)
, the screen is automatically switched
to the temperature/voltage screen once.
Pressing the initial screen display switch allows returning to the previous screen.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...