WARNING
19. For safe operation
- 176 -
3)
Escape from the cab being charged with electricity
If the machine is in the following conditions, jump out of the cab as distant from the machine as possible
immediately after leaving the operator's seat. Be careful that any part of your body does not come in contact
with the machine after landing. Contacting with the machine can lead to an electric shock.
1. The engine cannot be operated.
2. The crane is damaged and inoperable.
3. Other emergent conditions
4)
Be sure to use the machine involved in such an accident only after being inspected at your authorised KATO
dealer.
(
10
) Work according to signals
Choose one person to be the signaler.
If the signaler does not signal appropriately with the sling
handler and other workers, the working efficiency will fall and
there is the risk of accidents. Before starting the job, the
controller, signaler, sling handler and other workers who are
involved should confer on signal procedures in order to work
safely and steadily under the direction of the signaler.
(11)
Determine signals for joint operations
If two or more cranes are working together on a site, determine
the signaler and the signals in advance.
(12) Stop work in strong winds
・
Loads of high volume or side area and long booms are subject
to strong wind loads due to wind pressure. If the wind is strong
and is received from behind the crane, the wind load is added to
the suspended load mass which can cause the crane to tip over.
・
If a long boom derricked to a high angle is subjected to a strong
wind from the front, the crane can be tipped over.
・
If the wind has a gust speed of 10m/s or more, stop work
immediately, retract the boom and lower the load. If you are
working with a long boom or large load, stop work even if the
wind does not reach 10m/s.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...