WARNING
19. For safe operation
- 190 -
(24)
Never drag a load sideways, hoist it diagonally or drag it toward
the crane
Using boom lowering and derricking or winch operation to drag
the load sideways or hoist it diagonally causes a bending force
to act on the boom and can lead to damage of the boom and the
slewing mechanism or tipping the crane over.
Follow the appropriate instructions of the signaler to hoist the
load vertically.
(25) What to do if an earthquake occurs during an operation
1) Earthquake during an operation
If an earthquake happens while the crane is working, the
vibration feels greater and more alarming from the elevated
position of the operator's seat. First stop work composedly
and then respond to ground deformation or falling objects as
follows.
・
Lower the load to a safe place.
・
Slew to an orientation away from the danger of falling or
toppling objects while retracting the boom and then lower the
boom.
・
Stop the engine.
・
To avoid being shaken out of the cab, fix yourself in position
with your hands and feet and wait for the earthquake to die
down. If the door is open, shut it firmly.
2) Resuming work after the earthquake
To resume work once the earthquake has died down and there
is no concern over further tremors, check the condition of the
ground and the placement of the outriggers, look for
abnormalities in any part of the crane body, then check the
ACS, the arrangement of slings and any other abnormal
condition.
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...