![background image](http://html.mh-extra.com/html/kato/premium-cityrange-cr-200rf/premium-cityrange-cr-200rf_instruction-manual_657900240.webp)
- 211 -
21. Crane operation devices
Cr
ane
op
er
ation
d
ev
ice
s
21-1 Front panel
(T218351-028-0E)
(1)
PTO
(
Power Take Off
) switch
When the PTO switch is set to the "ON" position, the pump is
driven, power is supplied to the ACS and the slewing stop circuit is
released. The PTO pilot lamp of the switch and the PTO indicator
lamp on the information display light to tell the operator that crane
operation is possible.
・
Lock the suspension before you turn the PTO switch "ON".
If you turn the PTO switch "ON" without locking the suspension, the suspension lock
cylinders will lock where they are at different stages of extension.
・
If you lock the suspension lock cylinders without fully retracting them and attempt any crane
operations without the outriggers, the body will not be level and the crane will tip over.
・
Fully retract and lock the suspension cylinders regardless of whether or not the outriggers will
be used to turn the PTO switch "ON" before you start crane operation.
(541A-0155-2E)
・
Before you set the PTO switch to the "ON" position, confirm that the needle of the engine
water temperature gauge is above point "C". Setting the PTO switch to the "ON" position
while the engine coolant temperature is low could cause a seizure, fast wear, damage etc. due
to poor lubrication (
from high oil viscosity
) of the engine and torque converter.
・
Before you work the PTO switch, take your foot off the accelerator pedal so that the engine is
idling.
・
When the PTO switch is switched "OFF", the brake will be applied automatically to
immobilize the slewing upper structure regardless of the slewing brake switch position.
・
Before you drive on the road, move the slewing upper structure to the driving position, stow
the outriggers and set the PTO switch to the "OFF" position to return the suspension to the
driving position (suspension free state).
(T218151-111-0E)
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...