- 220 -
21. Crane operation devices
(17) Tilt lever
If the control levers obstruct your way to take or leave the operator seat, pull the tilt lever toward you
(rearward),
and all the control levers (
boom derricking/lowering lever and winch levers
) will be folded down rearward as a
unit. When you are operating the crane, return all the levers to the "crane operating positions".
:
To move the control levers to the "tilted positions", pull the tilt lever toward you and the lock will be
disengaged and the control levers will be folded down rearward.
:
To move the control levers to the "crane operating positions", push the tilt lever down and forward and the
lock will be engaged.
Whenever the control levers are in the tilted positions (folded down rearward), the crane is held
in the auto-stop condition. In this state, the crane cannot be operated even if any of the crane
control levers and pedals is operated.
(541A-0168-2E)
Never telescope the levers when they are held folded down rearward. Otherwise, the wiring in
the lever could break.
(591A-0045-0E)
(18) Winch lever lock
This is used to lock the winch lever when it is not operated, for preventing incorrect operation.
The winch lever is operable when the knob is pulled. It is fixed when the knob is returned.
The winch lever and the winch pedal are interlocked. The winch pedal is also locked if the lever is locked.
Do not press the winch pedal with a strong force while the lever is locked. The neutral position of
the winch lever may be misa
」
ligned to make the winch activate. In such a case, release the lever
lock immediately.
(591A-0046-0E)
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...