![background image](http://html.mh-extra.com/html/kato/premium-cityrange-cr-200rf/premium-cityrange-cr-200rf_instruction-manual_657900252.webp)
- 223 -
21. Crane operation devices
Cr
ane
op
er
ation
d
ev
ice
s
(4)
Bridging device key switch
(
self-reset type
)
In an emergency such as a malfunction in ACS-related devices or
crane stop etc. has occurred due to overload, set the operation
switch to the "release" position to take appropriate emergency
actions regardless of the ACS. The function of this switch is valid
for 30 minutes.
At this time, the indicator lamp will flash in red and the crane
operating speed will be restricted to a low speed during the
operation of the switch.
Press the reset switch to cancel the operation of the switch.
The bridging device key switch is only used to take emergency action to avoid a serious accident.
Before crane operation, take the key off the switch and it must be kept by the safety supervisor.
If the bridging device key switch is set to the "release" position intentionally when operating the
crane, the crane tipping over or other serious accident can be caused.
(T217671-042-0E)
(5) Outrigger plates (optional)
When you operate the outriggers, position the outrigger plates where the outrigger floats will be located.
Make sure the outrigger plates are stowed securely with stoppers installed and locked in the
correct positions to prevent the plates from falling out. Driving without the stoppers installed
properly could cause the outrigger plates to fall out, damage the machine from being thrown
from the brackets, or cause other traffic damage.
(521A-0100-0E)
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...