- 226 -
22. Crane operation when the outriggers are used
22-1 Suspension operation
(541A-0373-0E)
Any one of the faults below could cause the crane to tip over, so strictly observe all the relevant
precautions.
・
If you operate the crane without first locking the suspension, the crane could tip over, causing
a major accident.
・
When you operate the crane, fully retract the suspension lock cylinders to lock them.
・
If you lock the suspension while the suspension lock cylinders are not fully retracted, the tires
could be contact with the ground, causing a major accident.
・
Do not release the suspension lock until all crane operations are complete and you are about to
move the machine normally.
・
Push the suspension control switch to the "suspension retraction" side for about at least four
seconds. When the suspension cylinders are fully retracted and locked, check that the
suspension locked indicator lamp has lit.
・
Only retract and lock the suspension when the machine is on firm, level ground with the
outriggers stowed.
・
Use the suspension locked mode when moving within a job-site.
・
Never drive normally with the suspension locked.
Always release the suspension lock before you move the machine normally.
(T218351-042-0E)
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...