![background image](http://html.mh-extra.com/html/kato/premium-cityrange-cr-200rf/premium-cityrange-cr-200rf_instruction-manual_657900264.webp)
- 235 -
Cr
ane
op
er
ation
w
he
n the
o
utr
igger
s ar
e us
ed
22. Crane operation when the outriggers are used
・
If one or more outrigger selection switches are not selected, the horizontal selection switch or
vertical selection switch is black indicating that selection is unavailable.
If one or more outrigger selection switches are selected, the horizontal selection switch or
vertical selection switch is white indicating that selection is available.
・
If either of the horizontal selection switch or vertical selection switch is not selected, the
outrigger extension switch or outrigger retraction switch is black indicating that selection is
unavailable. If either of them is selected, the outrigger extension switch or outrigger retraction
switch is white indicating that selection is available.
・
Press the switch firmly until the confirmation tone sounds.
・
If the extension/retraction switch is not used within 30 seconds, all position selections will be
canceled. They will also be canceled immediately if the PTO switch is turned "OFF".
・
Outrigger operation is only possible when the outrigger operation OK indicator lamp is lit.
(T217161-118-0E)
3)
If the outrigger beam is extended by 40mm or more when the
PTO switch is at the "OFF" position with the shift lever moved
to any position other than "N" or when the machine driving
speed exceeds 3km/h
(for driving on the roads), the warning
window will appear, the switch for the extended outrigger beam
will light in red and the intermittent buzzer will sound. (
every
one-second interval)
If the warning window appears during driving on a road, stop the crane at a safe place
immediately and check whether the outrigger beam is fully retracted and the outrigger stopper
pin is securely inserted. If the outrigger is not fully retracted, retract it fully and insert the
outrigger stopper pin.
(T217051-088-0E)
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...