![background image](http://html.mh-extra.com/html/kato/premium-cityrange-cr-200rf/premium-cityrange-cr-200rf_instruction-manual_657900282.webp)
- 253 -
Cr
ane
op
er
ation
w
ith
ou
t o
utr
igger
s
23. Crane operation without outriggers
23-2 Stationary crane-on-rubber operation
(T217321-028-1E)
(1)
Conditions for stationary crane-on-rubber operation
1)
Maximum boom length: 19.6m
2) Suspension locked mode (
The suspension lock cylinder is fully retracted.
)
3)
Tire pressure: 900kPa
(
9.00kgf/cm
2
) (same pressure as for driving)
4)
Determine the boom status, working area and lifting capacity with reference to the lifting capacity chart for
stationary crane-on-rubber operation.
5)
Apply the parking brake and the brake lock at the same time.
・
When the pressure in the compressed air tank falls while the brake lock is in use and the foot
brake cannot operate, a buzzer will sound. Before you are going to use the foot brake again,
you must raise the engine speed to recharge pressure in the tank to the rated level.
・
Do not use the brake lock when the engine is not running or when the crane is not in use and
in any case never use it for more than one hour. Do not leave the machine unattended while
the brake lock is in use.
(541A-0197-1E)
Summary of Contents for PREMIUM CITYRANGE CR-200RF
Page 2: ...218711 背厚 14 5 mm 中 ...
Page 14: ... 12 4 Dimensions T217591 021 0E Specification of CR 200Rf ...
Page 16: ... 14 MEMO ...
Page 24: ... 22 MEMO ...
Page 30: ... 4 MEMO ...
Page 36: ... 10 MEMO ...
Page 38: ... 12 3 General operation devices 2 Outside the cab ...
Page 60: ... 34 MEMO ...
Page 74: ... 48 MEMO ...
Page 82: ... 56 7 Air conditioner 7 6 Display when errors are detected T217921 020 0E ...
Page 120: ... 94 MEMO ...
Page 129: ... 102 MEMO ...
Page 138: ... 111 17 Drive operation devices Drive operation devices ...
Page 139: ... 112 17 Drive operation devices ...
Page 153: ... 126 17 Drive operation devices ...
Page 154: ... 127 17 Drive operation devices Drive operation devices ...
Page 237: ... 208 21 Crane operation devices 21 Crane operation devices 061A 0005 0E 1 Inside the cab ...
Page 238: ... 209 21 Crane operation devices Crane operation devices ...
Page 239: ... 210 21 Crane operation devices 2 Outside the cab ...
Page 259: ... 230 22 Crane operation when the outriggers are used ON OFF ...
Page 299: ... 270 24 Crane operation NOTE Extension retraction sequence for each boom length ...
Page 320: ...26 Preoperational checks Pre drive checks 290 ...
Page 321: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 291 ...
Page 322: ...26 Preoperational checks Pre drive checks 292 ...
Page 329: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 299 ...
Page 330: ...26 Preoperational checks Pre drive checks 300 ...
Page 331: ...Preoperational checks Pre drive checks 26 Preoperational checks Pre drive checks 301 ...
Page 332: ... 302 MEMO ...
Page 340: ... 310 MEMO ...
Page 342: ...899 92187110 ...